Advanced Purchase Order - project assignment

Posted about 1 year ago by Joel Meulman

Post a topic
J
Joel Meulman

Could there be a drop down at the end of each line which would  assign the line to the project. Ideally, it would also be able to be edited after the PO had been sent (in case a line was incorrectly assigned).


This would make the advanced PO data entry and editing more intuitive.


Thanks

0 Votes


0 Comments

Login or Sign up to post a comment