Used materials, if we use something that is not within the materials of the job it will add the item to the job but will automatically tick these materials as Billable, could we have a selection within the use materials field that we can select if we want to have the items billed or not.
Used materials, if we use something that is not within the materials of the job it will add the item to the job but will automatically tick these materials as Billable, could we have a selection within the use materials field that we can select if we want to have the items billed or not.
Attachments (1)
Use Material....jpg
56.4 KB
0 Votes
0 Comments
Login or Sign up to post a comment