In Projects, it is possible to select "Phases" and only see the detail on that phase:
That allows our users to work on a "Phase" which may include 50+ items in Tasks and 50+ items in Products (per phase).
Even though it's possible to "open" a phase within a quote, for consistency, it would be great to have Phases selectable in the same was as it's done for Projects.
In addition (and possibly this is a different Feature Request), there should be a system parameter to force Phases to be consistent from Quote through Project, rather than being able to rename them.
In Projects, it is possible to select "Phases" and only see the detail on that phase:

That allows our users to work on a "Phase" which may include 50+ items in Tasks and 50+ items in Products (per phase).
Even though it's possible to "open" a phase within a quote, for consistency, it would be great to have Phases selectable in the same was as it's done for Projects.
In addition (and possibly this is a different Feature Request), there should be a system parameter to force Phases to be consistent from Quote through Project, rather than being able to rename them.
0 Votes
0 Comments
Login or Sign up to post a comment